Project Description

Induneil

Living at Induneil really is like living in a world curated entirely for you. And it all begins with the very building you live in. Through a host of carefully selected physical amenities, it’s the perfect setting for you to turn your biggest ideas into greater successes, as well as experiencea level of peace and tranquility only a few have known to exist.

Specification

  • Structure : R.C.C. coulmn/beams slabs.
  • Walls : 8”/6”/4” thick external & 3”/4” thick internal par tition walls, all internal walls and ceiling will have Plaster of Paris finish with a coat of cement primer and dry distemper over it.
  • Parking : Floor Chequred Tiles.
  • Toilets : Flooring in ceramic tiles and dado in ceramic tiles upto choukhat height. Basin with hot & cold mixture will be provided in both toilets.(Geysers not provided)
  • Electrification : Concealed copper wiring with standard make modular fittings and fixtures. Fan regulators, provision for AC point and T.V. & Telephone point in Drawing Room and all Bedrooms andintercom facility shall be provided (A.C., Fan, Tubelights not provided)
  • Floors : Vitrified/ceramic floor tiles in whole flat (Make size and quality as per discretion of the builder)
  • Doors : Wooden frame with flush/panel type shutters. Wooden/UPC door frames in Toilets. Ultra locking in main door and cylindrical lock in all bedrooms and toilet doors.
  • Windows : Three track sliding aluminum/UPVC windows with two track glazed and one track mosquito net provision.
  • Water Management : Connection from deep tube well to overhead tank connected with electric pump.
  • Sanitary Fittings : All C.P. or brass fittings of standard make. White glazed vitreous sanitaryware, cistern of white acrylic fibre glass. Hot and Cold provision in basin at Dining area with basin mixture.
  • Kitchen : All C.P. or brass fittings of standard make. Hot and cold provision.

Resources

RERA Details

  • Project Name : Induneil
  • RERA No : JHARERA/PROJECT/2025/00123
  • Promoter : The Rameshwaram Group
  • Location : Kathal More
  • Official Website : https://rera.jharkhand.gov.in/

On Map

Construction Updates

Tower A

TOWER A

March 2025

Raft w/p – 100%

Raft/Pile cap – 100%

Stub col – 40%

Plinth Beam – 10%

Tower B

TOWER B

April 2025

Raft w/p – 100%

Raft/Pile cap – 100%

Stub col – 40%

Plinth Beam – 10%

Tower C

TOWER C

May 2025

Raft w/p – 100%

Raft/Pile cap – 100%

Stub col – 40%

Plinth Beam – 10%