Scroll to top
Project Description

Shree Radhe

Project Shree Radhe Apartment by Rameshwaram Group in Tupudana, Ranchi, offers 3BHK flats that are thoughtfully designed for modern lifestyles. Each unit is RERA-registered for your peace of mind.

Specification

  • Structure : R.C.C. coulmn/beams slabs.
  • Walls : 8”/6”/4” thick external & 3”/4” thick internal par tition walls. All internal walls and ceiling will have plaster of Paris finish with a coat of cement primer and dry distemper over it.
  • Floors : Vitrified/Ceramic floor tiles in whole flat ( Except Toilets) (Make size and quality as per discretion of the builder)
  • Doors : Wooden / Synthetic frame with flush/panel type shutters of wood. Ultra locking in main door and cylindrical lock in all bedrooms and toilet doors.
  • Windows : Three track sliding aluminium / PVC windows with two track glazed and one track mosquito net provision.
  • Water Arrangement : Connection from deep tube well to overhead tank connected with electric pump
  • Toilets : Flooring in ceramic tiles and dado in ceramic tiles upto ceiling height. Corner basin with hot & cold mixture will be provided in both toilets.(Geysers not provided)
  • Sanitary Fittings : All C.P. or brass fittings of standard make. White glazed vitreous sanitary ware, cistern of white acrylic fibre glass.
  • Kitchen : All C.P. or brass fittings of standard make. Hot and cold provision.
  • Electricals : Concealed copper wiring with standard make modular fittings and fixtures. Fan regulators, provision for AC point and T.V. & Telephone point in Drawing Room and all Bedrooms .(A.C., Fan, Tubelights not provided)
  • Parking : Floor Chequred Tiles

Resources

RERA Details

  • Project Name : Shree Radhe
  • RERA No : JHARERA/PROJECT/2025/00123
  • Location – Dungri, Tupudana
  • Rera Carpet Area - 1063 Sq. Ft.
  • Super Built-Up Area - 1660 Sq. Ft.
  • Status - Ongoing
  • Promoter : The Rameshwaram Group
  • Official Website : https://rera.jharkhand.gov.in/

On Map

Construction Updates

Tower A

TOWER A

March 2025

Raft w/p – 100%

Raft/Pile cap – 100%

Stub col – 40%

Plinth Beam – 10%

Tower B

TOWER B

April 2025

Raft w/p – 100%

Raft/Pile cap – 100%

Stub col – 40%

Plinth Beam – 10%

Tower C

TOWER C

May 2025

Raft w/p – 100%

Raft/Pile cap – 100%

Stub col – 40%

Plinth Beam – 10%