Scroll to top
Project Description

Punit Enclave Block C

Experience a lifestyle designed around you at Punit Enclave, a premium project by the Rameshwaram Group — where every detail begins with the very building you call home. Living at Punit Enclave truly feels like being in a world curated entirely for you. Developed by the trusted Rameshwaram Group, this project reflects quality construction, thoughtful planning, and a commitment to excellence.

Specification

  • Structure : R.C.C. column/beams slabs.
  • Walls : 8”/6”/4” thick external & 3”/4” thick internal par tition walls. All internal walls and ceiling will have plaster of Paris finish with a coat of cement primer and dry distemper over it.
  • Floors : Vitrified/Ceramic floor tiles in whole flat ( Except Toilets) (Make size and quality as per discretion of the builder)
  • Doors : Wooden / Synthetic frame with flush/panel type shutters of wood. Ultra locking in main door and cylindrical lock in all bedrooms and toilet doors.
  • Window : Three track sliding aluminium / PVC windows with two track glazed and one track mosquito net provision.
  • Water Arrangement : Connection from deep tube well to overhead tank connected with electric pump.
  • Toilets : Flooring in ceramic tiles and dado in ceramic tiles upto ceiling height. Corner basin with hot & cold mixture will be provided in both toilets.(Geysers not provided)
  • Sanitary Fittings : All C.P. or brass fittings of standard make. White glazed vitreous sanitary ware, cistern of white acrylic fibre glass.
  • Kitchen : All C.P. or brass fittings of standard make. Hot and cold provision.
  • Electricals : Concealed copper wiring with standard make modular fittings and fixtures. Fan regulators, provision for AC point and T.V. & Telephone point in Drawing Room and all Bedrooms .(A.C., Fan, Tubelights not provided)
  • Parking : Floor Chequred Tiles

Resources

RERA Details

  • Location : Tupudana
  • RERA No. : JHARERA/Project/37/2022
  • RERA Carpet Area : 815 - 994 Sq.Ft.
  • RERA Super Built Up Area : 1200 - 1595 Sq.Ft.
  • Status : Handing over

On Map

Construction Updates

TOWER A

March 2025

Raft w/p – 100%

Raft/Pile cap – 100%

Stub col – 40%

Plinth Beam – 10%

TOWER B

April 2025

Raft w/p – 100%

Raft/Pile cap – 100%

Stub col – 40%

Plinth Beam – 10%

TOWER C

May 2025

Raft w/p – 100%

Raft/Pile cap – 100%

Stub col – 40%

Plinth Beam – 10%

Pictures & Videos

Projects You May Like