Scroll to top
Project Description

Nabarun

Living at Nabarun means choosing a home designed with care and purpose. This project is proudly developed by Rameshwaram Group, delivering quality you can trust. With its well-crafted structure and thoughtful design, it offers comfort, clarity, and a lifestyle that feels truly rewarding.

Specification

  • Structure : R.C.C. coulmn/beams slabs.
  • Walls : 8”/6”/4” thick external & 3”/4” thick internal par tition walls. All internal walls and ceiling will have plaster of Paris finish with a coat of cement primer and dry distemper over it.
  • Floors : Vitrified/Ceramic floor tiles in whole flat ( Except Toilets) (Make size and quality as per discretion of the builder)
  • Doors : Wooden / Synthetic frame with flush/panel type shutters of wood. Ultra locking in main door and cylindrical lock in all bedrooms and toilet doors.
  • Windows : Three track sliding aluminium / PVC windows with two track glazed and one track mosquito net provision.
  • Water Arrangement : Connection from deep tube well to overhead tank connected with electric pump.
  • Toilets : Flooring in ceramic tiles and dado in ceramic tiles upto ceiling height. Corner basin with hot & cold mixture will be provided in both toilets.(Geysers not provided)
  • Sanitary Fittings : All C.P. or brass fittings of standard make. White glazed vitreous sanitary ware, cistern of white acrylic fibre glass.
  • Kitchen : All C.P. or brass fittings of standard make. Hot and cold provision.
  • Electricals : Concealed copper wiring with standard make modular fittings and fixtures. Fan regulators, provision for AC point and T.V. & Telephone point in Drawing Room and all Bedrooms .(A.C., Fan, Tubelights not provided)
  • Parking : Floor Chequred Tiles

Resources

RERA Details

  • Location : Radium Road
  • RERA No. : JHARERA/Project/12/2018
  • RERA Carpet Area : 1021 - 1118 Sq.Ft.
  • RERA Super Built Up Area : 1385 - 1490 Sq.Ft.
  • Status : Handing over

On Map

Construction Updates

TOWER A

March 2025

Raft w/p – 100%

Raft/Pile cap – 100%

Stub col – 40%

Plinth Beam – 10%

TOWER B

April 2025

Raft w/p – 100%

Raft/Pile cap – 100%

Stub col – 40%

Plinth Beam – 10%

TOWER C

May 2025

Raft w/p – 100%

Raft/Pile cap – 100%

Stub col – 40%

Plinth Beam – 10%

Pictures & Videos

Projects You May Like